Tuesday, March 29, 2022

Post Production is About to Commence

         Entry 33: 3/29/22

     So now the final run begins. It is currently Tuesday the 29th of March and the project is due April 10th. Boy oh boy.

     One thing completed today was that Isa went and dropped off the equipment back with BECON. Maya came along with Isa as well as they both had equipment. Isa used the blue cart again and had a quick interaction with Jim so I do not have any pictures but it was a relief to have all of that out of our hands and we were not missing anything. Phew. One last time, thanking Jim for being the best man in the world and having equipment for students.

     Something else was that Isa picked up the hard drive from Wade and had to delete some stuff off of it to fit all the documentary footage. There is so much footage + it is 4k so you can imagine how long this is all going to take. Isa was going this whole process and updating me but basically she put everything on the CBTV hard drive onto her's so that we can put all the documentary files onto it. Here is what Isa sent me while we were texting. It was going to take some time.



     That is all for today unfortunately. Extremely thankful that we have Monster #2 and the hard drive but this is all we can do today. Isa is going to send the stills soon from the documentary so I will be able to upload some things again onto the social media so I can't wait for that. Tomorrow is Lightning Oscars rehearsal AH and Isa is going to start doing transcriptions of the interviews. Hopefully that does not take too long so we can jump into editing. 

No comments:

Post a Comment